Minister of State for Petroleum Resources, Mr. Ibe Kachikwu, has said the Dangote refinery features high on its hope to fulfil its promise to Nigerians to end fuel importation by December 2019.
Kachikwu who palpably impressed by the project explained that the present government had always believed that the private sector holds the ace in industrialization efforts of the government.
He spoke during his visit to Dangote oil Refinery site at Lekki free trade Zone, in Lagos.
The minister noted that that belief has been reinforced by what the Dangote Group is doing.
He said, It is good to say that private sector is the answer to Nigerian’s problems with a project as big as this. The challenge I will give you today is that of time, I see your time for completion is 2019 December but I am sure you will understand my greed if I tell you that the refinery component of this project should come earlier than the set date.
“I have made very firm commitment to Nigerians that I must stop the importation of petroleum products by 2019 and I am going to keep to it. It is absolutely important that we do this early and given the feat that we have achieved in terms of speed of construction and I urge you to do all within you to achieve its completion before the due date.
“I am sure His Excellency President Buhari will be absolutely enthused if he were to find himself, not only crystalizing the policy position we have taken so far but also coming here himself to come and open a facility as big as this before the end of his first term. Whatever configurations your engineers have come up with, I urge that they go back to the drawing board and get me my refined products before your said date.”
Chairman of the Dangote Group, Aliko Dangote, who led the minister round the facility, said he has accepted the challenge and would do all possible to achieve the feat.
“On the honourable minister’s challenge, we are going to make it by the grace of God. I am sure the minister will support us to make sure that we meet his challenge,” he said.
According to him, “What the minister is trying to do is the best so far for our country, his own version is that Nigeria should not think of exporting crude, you know the problem we have in Africa is that we only export raw materials, not finished goods, so he is saying that, look, we should all do this by adding value and I pray that even at 2.5million barrels, we should not export much, in terms of the crude.
“We will go back and see what to do to make this happen by fast tracking our processes since the Minister has assured of government’s cooperation and support”
Earlier in his welcome address, Dangote explained that his group is building the world’s largest single line Refinery, Petrochemical Complex and the world’s second largest Urea Fertiliser plant. The Refinery, according to him will have the capacity to refine 650,000 barrels of crude oil per day. The Petrochemical Plant will produce 780 KTPA Polypropylene, 500 KTPA of Polyethylene while the Fertiliser project will produce 3.0 million metric tonnes per annum (mmtpa) of Urea.
“In addition, we are also building the largest sub-sea pipeline infrastructure in any country in the world, with a length of 1,100km, to handle 3 billion SCF of gas per day. We also plan to construct a 570 MW power plant in this complex. As a matter of fact, gas from our gas pipeline will augment the natural domestic gas supply and we estimate an additional 12,000MW of power generation can be added to the grid with the additional gas from our system.
“We will be adding value to our economy as all these projects will be creating about 4,000 direct and 145,000 indirect jobs. We will also save over $7.5billion for Nigeria annually, through import substitution and generate an additional $5.5billion per annum through exports of the refined petroleum products, fertilizer and petro chemicals. We envisage that these projects, which would cost over $18billion, would be completed in 2019.